275kV Line Build

KIDSTON

Construction of 275kV steel monopole overhead line. Contributing to the overall build and commissioning of the green energy hub at Kidston, these works included stringing a 600m span across the Einasleigh Pumped Hydro storage dam, providing a different view below for our crew.

Image
Beon
Australian Power Industry Partners

Contact us

Phone: 1300 396 826
Email: admin@@apip.com.au

PO Box 330 Samford Qld 4520 Australia

Quick Links