33kV HV Cable Terminations

COLUMBOOLA SOLAR FARM

APIP were pleased to be part of this great green energy project, connecting the newly commissioned Columboola Solar Farm to the grid. APIP works involved installation and termination of HV cables between the substation and the indoor switch gear. This work followed on from the construction of the substation, assisting AMP control meet their project timeframes.